965687-1
FIXING RING
Enhance your industrial and commercial transportation systems with our FIXING RING, a crucial accessory for maintaining secure connections in wire-to-wire and wire-to-board setups. Crafted from durable PBT GF material, this black ring ensures reliable performance even in harsh environments, meeting UL 94-HB standards for material flammability. With a package quantity of 1500, it's ideal for high-volume applications. Featuring 4 and 7 positions, it offers versatility for various connection needs. Operating seamlessly in temperatures ranging from -40 to 120°C (-40 to 248°F), this essential component guarantees robust functionality. Rest assured of its quality and compliance as it is RoHS-certified. Elevate your automotive connectors and accessories with this essential component.
Details
Product Category: | |
Manufacturer: | TE Connectivity |
Manufacturer Part Number: | TE Connectivity 965687-1 |
Color: | Black |
Accessory Type: | Other |
Body Material: | PBT GF |
Number of Positions: | 4, 7 |
Operating Temperature Range: | -40 - 120 °C, -40 - 248 °F |
Connector System: | Wire to Board, Wire to Wire |
Material Flammability Standard: | UL 94-HB |
Part Aliases: | 965687-1 |
SKU: | AMP965687-1 |
Frequently bought together
Compliance
Environmental Initiative Details
Environmental Initiative: | RoHS |
---|---|
Compliant: | Unknown |
Date of this Information: | Unknown |
Notes: |
Product Change Notice
Product Change Notice
Effective Date | Description of Change | Download |
---|---|---|
10/31/2025 | PCN-25-238710 - Supplier Change. transferring component(s) of the following part number(s) from supplier Alhorn, Germany to TE approved suppliers in Germany and Morocco. These PNs are TE proprietary designs, therefore considered catalog/general market product. TE reserves the right to move tool back to prior location/supplier based on business need. PPAP and/or sample requests must be submitted within 14 days of PCN submission via ict-ppap-request@te.com or ePPAP system. Submission will not occur without request. If PPAP requested, disposition response is required within 14 days of submit date or it will be considered approved. | Download |
06/14/2022 | P-22-022696 - Manufacturing location change. Following Part Numbers will be transferred from TE Speyer (Germany) to a Outside Vendor in Germany | Download |