Attribute | Value |
---|---|
Product Category: | |
Manufacturer: | Bel Fuse Inc. |
Manufacturer Part Number: | Bel Fuse Inc. 0678D4000-02 |
Series: | 0678D |
Mount Type: | Surface Mount |
Response Time: | Fast Blow |
Fuse Type: | Surface Mount |
Case Size: | 3912 |
Current Rating: | 4 A |
Fuse Material: | Ceramic |
Voltage Rating (AC): | 350 VAC |
Voltage Rating (DC): | 125 VDC |
SKU: | BEF0678D4000-02 |
0678D4000-02
Specifications
Detailed Description
Introducing our Surface Mount Ceramic Tube Fuse, designed for reliable circuit protection in electronic devices. With a 3912 case size, this fast-acting fuse ensures quick response to overcurrent events, safeguarding your equipment. Rated for 4A at both 350VAC and 125VDC, it offers versatile protection in various applications. RoHS compliant, this fuse aligns with environmental standards, making it a sustainable choice for your projects. Trust in its high-quality construction and performance to keep your circuits safe.
Product Change Notice
Effective Date | Description of Change | Download | |||
---|---|---|---|---|---|
07/01/2025 | PCN-F250019 - Label update. Add Data matrix in label for the fuse that above listed. | Download | |||
05/01/2025 | PCN-F250002 - Assembly Location Transfer. The manufacturing location of brick fuses will be relocating to a larger manufacturing facility in Shenzhen, Guangdong Province. There is no change in the country of origin (COO). Shipment may contain products manufactured from existing and new manufacturing sites starting from 1 May 2025 until the inventory from existing manufacturing site is fully depleted. | Download | |||
03/31/2025 | PCN F2400014 - Production Transfer.As part of the continuous optimization of our global production in terms of suitable products/product technology, we have determined to transfer production within China. It is necessary to expand production into another facility to secure additional capacity and support future growth. The new manufacturing location is ISO 9001 certified. The product transfer will begin in January with the target of being able to produce the first products during February 2025. Timing varies by products, with initial mass production in Q2, 2025. | Download |