Attribute | Value |
---|---|
Product Category: | |
Manufacturer: | Bel Fuse Inc. |
Manufacturer Part Number: | Bel Fuse Inc. 0680L0375-05 |
Series: | 0680L |
Mount Type: | Surface Mount |
Response Time: | Slow Blow |
Fuse Type: | Surface Mount |
Case Size: | 2410 |
Current Rating: | 375 mA |
Voltage Rating (AC): | 125 VAC |
Voltage Rating (DC): | 125 VDC |
SKU: | BEF0680L0375-05 |
plating: | Silver |
0680L0375-05
Specifications
Detailed Description
Enhance circuit protection with this surface mount fuse. Featuring a 2410 case size and a slow blow response time, it's designed for efficiency and durability. With a current rating of 375mA and silver-plated construction, it ensures reliable performance. This fuse is suitable for both AC and DC applications, with voltage ratings of 125VAC and 125VDC respectively. RoHS compliant, it meets environmental standards. Upgrade your fuse protection with this high-quality component.
Product Change Notice
Effective Date | Description of Change | Download | |||
---|---|---|---|---|---|
07/01/2025 | PCN-F250019 - Label update. Add Data matrix in label for the fuse that above listed. | Download | |||
05/01/2025 | PCN-F250002 - Assembly Location Transfer. The manufacturing location of brick fuses will be relocating to a larger manufacturing facility in Shenzhen, Guangdong Province. There is no change in the country of origin (COO). Shipment may contain products manufactured from existing and new manufacturing sites starting from 1 May 2025 until the inventory from existing manufacturing site is fully depleted. | Download | |||
03/31/2025 | PCN F2400014 - Production Transfer.As part of the continuous optimization of our global production in terms of suitable products/product technology, we have determined to transfer production within China. It is necessary to expand production into another facility to secure additional capacity and support future growth. The new manufacturing location is ISO 9001 certified. The product transfer will begin in January with the target of being able to produce the first products during February 2025. Timing varies by products, with initial mass production in Q2, 2025. | Download |