Attribute | Value |
---|---|
Product Category: | |
Manufacturer: | TE Connectivity |
Manufacturer Part Number: | TE Connectivity 174355-7 |
Series: | Econoseal,Econoseal J - 070 Mark II |
Accessory Type: | TPA (Terminal Position Assurance) |
Standards Met: | UL 94V-2 |
SKU: | AMP174355-7 |
174355-7
Heilind Number: | AMP174355-7 |
Manufacturer: | TE Connectivity |
Manufacturer Number: | 174355-7 |
Datasheet: | Datasheet |
ECAD Model: |
Description:
070 ECONOSEAL MARK-2 P/CAP 2P
Specifications
Frequently Bought Together
Product | Part # | Description | Stock |
---|---|---|---|
![]() | TE Connectivity 172161-1 | 9 CIR UNIV M-N-L CAP | ![]() |
![]() | TE Connectivity 174352-2 | 070 ECONOSEAL MARK-2 PLUG 2P | ![]() |
![]() | TE Connectivity 174354-2 | 070 ECONOSEAL MARK-2 CAP 2P | ![]() |
![]() | TE Connectivity 174358-7 | 070 ECONOSEAL MARK-2 P/PLUG 3P | ![]() |
![]() | TE Connectivity 174359-2 | 070 ECONOSEAL MARK-2 CAP 3P | ![]() |
![]() | TE Connectivity 174360-7 | 070 ECONOSEAL MARK-2 P/CAP 3P | ![]() |
![]() | TE Connectivity 1838274-3 | M12 FLD SER CONN. FEMALE SKT S | ![]() |
![]() | TE Connectivity 206509-1 | SIZE 20 KEYING PLUG | ![]() |
![]() | TE Connectivity 282080-1 | AMP SUPERSEAL 1.5 SERIES 2P PL | ![]() |
![]() | TE Connectivity 2822352-1 | 070 TYPE RUBBER PLUG | ![]() |
![]() | TE Connectivity 2822357-1 | 070 CAVITY PLUG | ![]() |
![]() | TE Connectivity 321870 | TERMINAL SOLIS R 2/0 5/16 | ![]() |
![]() | TE Connectivity 33471 | TERMINAL,SOLIS R 4 3/8 | ![]() |
![]() | TE Connectivity 36934 | BODY SOLIS RING 4/0 1/2 | ![]() |
![]() | TE Connectivity 4-640440-2 | 12P MTA100 CONN ASSY 22AWG RED | ![]() |
![]() | TE Connectivity 776273-1 | 14POS,AMPSEAL,SOC HSG ASSY,SLD,COD 1 | ![]() |
![]() | TE Connectivity ES2000-NO.2-B9-0-33MM | ES2000-NO.2-B9-0-33MM | ![]() |
![]() | TE Connectivity HTAT-48/13-0-STK | NB08082001 | ![]() |
For Use With
Product | Part # | Description | Stock |
---|---|---|---|
![]() | TE Connectivity 174354-2 | ![]() |
Product Change Notice
Effective Date | Description of Change | Download | |||
---|---|---|---|---|---|
02/20/2024 | P-23-025379 - MOQ & DU Change. To inform you about a change in delivery unit & minimum order quantity (MOQ) impacting PNs listed below in this PCN. As of February 20, 2024 we will increase the delivery unit & the minimum order quantity according to attached file. The order quantity should therefore be not less than the MOQ and should be dividable through the MOQ. Dimensions and material of product and shipping box will stay the same. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. The product in scope of this PCN is TE general sales / catalogue product, therefore TE reserves the right to determine delivery unit & MOQ. No PPAP will be submitted for this PCN. It is kindly requested to adjust order quantities before the activation on February 20, 2024 to avoid blocked orders in case adjustments have not taken place in time. | Download | |||
04/11/2016 | P-16-012577 - UPDATE TO PCN P-16-012525. To ensure a smooth and stable transition from SWDC to EPDC, TE will be delaying the transition from the current Santa Teresa, NM DC (SWDC) to the new El Paso, TX DC (EPDC), originally scheduled to implement February 8th - 15th, is now scheduled to implement April 11th - 15th. This delay will allow extended testing on all SAP systems and procedures to ensure a seamless transition into the new warehouse. As we migrate the product and go-live on the new SAP WM software, it is critical to ensure this testing and training is fully incorporated into the systems and operational processes in the new El Paso warehouse. Based on the revised timing of transition, both Customer Shipments and Supplier Deliveries will continue to process from the Santa Teresa, NM location: Address: 101 Lindbergh, Santa Teresa, NM 88008, DUNS Code: 036967748. See attached Customer Letter. | Download | |||
02/15/2016 | P-16-012525 - Location Change. TE has established a new Distribution Center in El Paso, TX to support our South-West Customers. The transition to El Paso will take place during the weekend of February 13th - 14th. | Download |